Methods · Topic T1
How AI should be brought into an organization
It prints in full from the browser, on A4 or Letter.
The problem
Bringing AI into an organization that is just starting so that what gets tested reaches operation, people adopt it and its value can be shown beyond the pilot.
Summary in three lines
- The starting point is the organization's problems, not the technology available: each opportunity states which problem it solves, for whom and how a good result will be recognized, and not every need calls for AI.
- A portfolio with shared criteria decides what moves forward; validation is progressive —proof of value, pilot, scale— and at each step a business metric can stop the initiative.
- Governance is the backbone of the program, not a final formality: roles and owners, risks and impact assessed from the design, and adoption measured in users and decisions, not in access.
The map
From the organization's problem to an adopted, governed capability
Swipe to see the whole map.
Legend of shapes and colors
- Actor — who does the work
- Data — what is stored and read
- Control — a rule that gets checked
- Person — a person decides
- External — what comes from outside
Reading the map, node by node
The organization and its problem feed an opportunity portfolio that is filtered with prioritization criteria. What gets prioritized goes through a proof of value —which also decides whether to build, buy or compose with vendors and platforms— and a pilot with a metric, and only then scales into a capability in operation. That capability reaches trained people, its real use is measured as adoption, and that evidence decides whether to scale, adjust or stop; what gets adjusted goes back to the portfolio. Governance runs underneath: the organization appoints roles and owners, who answer for an AI management system; the system assesses risks and impact, and that analysis conditions every decision to scale.
- Node 1 The organization and its problem (Person) — Who decides, which process falls short and what result is expected: the starting point, before any tool.
- Node 2 Opportunity portfolio (Data) — Each opportunity written as a problem, its users and the expected result, with its owner.
- Node 3 Prioritization criteria (Control) — Value, feasibility, available data, risk, third-party dependency, integration and capacity for adoption, the same for the whole portfolio.
- Node 4 Proof of value (Control) — The main hypothesis, tested at the lowest reasonable cost and risk, and the indicator's baseline set before the pilot.
- Node 5 Pilot with a metric (Control) — Real users and a result agreed beforehand; if it is not reached, the pilot is paused and reviewed.
- Node 6 Capability in operation (Actor) — The solution integrated into the process, with oversight, documentation and someone who answers when the result is not the expected one.
- Node 7 Trained people (Person) — Those who use the capability learn on their own processes and products, not on a generic demo.
- Node 8 Measured adoption (Control) — Users responsible for the process, recurring use and decisions that rely on the capability: real use, not access.
- Node 9 Scale, adjust or stop (Control) — The evidence of adoption and value decides; stopping after properly invalidating a hypothesis is not a failure.
- Node 10 Roles and owners (Person) — The business answers for the purpose and the results; data, security, risk, compliance and technology step in according to the initiative.
- Node 11 AI management system (Control) — Policies, objectives, processes, controls and continual improvement: AI treated as a capability that is managed, not as a sum of projects.
- Node 12 Risks and impact (Data) — The consequences of a wrong answer or an unwanted action, vendor dependency and the effect on people and processes.
- Node 13 Vendors and platforms (External) — What already exists outside: it is bought or composed when it meets the need with less operation of one's own.
Connections
- from The organization and its problem to Opportunity portfolio (raises)
- from Opportunity portfolio to Prioritization criteria (is filtered)
- from Prioritization criteria to Proof of value (prioritizes)
- from Vendors and platforms to Proof of value (composes)
- from Proof of value to Pilot with a metric (validates)
- from Pilot with a metric to Capability in operation (scales)
- from Capability in operation to Trained people (reaches)
- from Trained people to Measured adoption (real use)
- from Measured adoption to Scale, adjust or stop (evidence)
- from Scale, adjust or stop to Opportunity portfolio (returns)
- from The organization and its problem to Roles and owners (appoints)
- from Roles and owners to AI management system (answers for)
- from AI management system to Risks and impact (assesses)
- from Risks and impact to Scale, adjust or stop (conditions)
The phases
Phase 1 Start from the company's problems, not from the technology
Inputs
- The processes, decisions and results that fall short of expectations today.
- The capabilities and data the organization already has.
Activities
- Map the process as it is executed, not as the manuals describe it, before proposing a solution.
- Write each opportunity as a problem, its users, the expected result and an owner.
- Separate what a process improvement, a rule or an analytics product can solve from what calls for AI.
Artifacts
- The written opportunities, with their problem and their owner.
- The map of the executed process.
- Who decides
- Leadership, with the owner of each process.
- Control that closes the phase
- No opportunity enters the portfolio without stating which problem it solves and for whom.
EvidenceAt Fundación CTIC each opportunity first had to state which problem it solved and for whom; with that rule more than 10 were identified and half of them were formally evaluated.
Phase 2 Prioritize the AI use cases with shared criteria
Inputs
- The opportunity portfolio.
- The prioritization criteria, agreed before scoring.
Activities
- Score each case on value, feasibility, available data, risk, third-party dependency, integration and capacity for adoption.
- Choose the solution pattern: not every AI initiative needs an agent.
- Open a file for each prioritized initiative.
Artifacts
- The prioritized portfolio.
- The file with its owner, expected results, initial risks and evaluation criteria.
- Who decides
- Whoever sponsors the portfolio, with the areas that will use it.
- Control that closes the phase
- Every prioritized initiative has an owner, expected results, initial risks and evaluation criteria written down before it starts.
State of the fieldThe Cloud Adoption Framework asks to evaluate each use case on feasibility, strategic value and resources, and to score it on business impact, technical complexity, resource requirements and alignment with goals.[2]
Phase 3 Validate with a proof of value before building
Inputs
- The prioritized initiative and its main hypothesis.
- The indicator the case promises to move.
Activities
- Test the hypothesis with a data exploration, a controlled test or a limited prototype.
- Start with an internal case, with no customers exposed.
- Set the indicator's baseline before the pilot.
Artifacts
- The hypothesis confirmed or discarded, in writing.
- The baseline.
- Who decides
- The owner of the initiative.
- Control that closes the phase
- If the hypothesis does not hold, the initiative is stopped or redesigned: stopping is also a result.
EvidenceAt Fundación CTIC the aim is for validation to be progressive: a data exploration, a controlled test or a limited prototype can generate enough evidence to move forward, change the approach or stop before committing more resources.
Phase 4 Pilot with a business metric that can stop it
Inputs
- The approved proof of value and its baseline.
- The result agreed with the sponsor.
Activities
- Run with real users in a bounded scope.
- Measure against the baseline, not against an impression.
- Write down the decision: scale, change course or stop.
Artifacts
- The pilot's result against what was agreed.
- The written decision, with its owner.
- Who decides
- The sponsor, with the process owner.
- Control that closes the phase
- A pilot that does not reach the agreed result is paused and reviewed; nothing scales by inertia.
State of the fieldThe Cloud Adoption Framework proposes using business metrics as decision gates: if a pilot doesn't meet the agreed-upon results, the work is paused and the use case reassessed.[4]
Phase 5 Scale with governance: roles, risks and impact
Inputs
- The approved pilot.
- The policies and obligations that apply to the organization.
Activities
- Assign roles, responsibilities and authorities: not every AI decision belongs to the technical team.
- Assess the system's risks and impact before extending it.
- Record the system in the inventory, with its life cycle.
Artifacts
- The risk matrix and the impact assessment.
- The inventory of AI systems.
- Who decides
- Senior leadership, with the business, data, risk and technology owners.
- Control that closes the phase
- No system goes into operation without an owner, a risk and impact assessment and its place in the inventory.
EvidenceAt Fundación CTIC the strategy is structured following ISO/IEC 42001, in its UNE-ISO/IEC 42001:2025 adoption, with more than 20 instruments of the management system; one of its matrices is the risk analysis of each use case, and the standard also requires assessing the impact of AI systems.
Phase 6 Train, measure adoption and decide whether to scale, adjust or retire
Inputs
- The capability in operation.
- The people who are going to use it.
Activities
- Train on people's own processes and products, as part of the delivery.
- Measure real use: users with responsibility, recurrence and supported decisions.
- Compare against the baseline and decide whether to scale, adjust or retire.
Artifacts
- The training program.
- The reading of adoption and value.
- Who decides
- The process owner.
- Control that closes the phase
- What is not used or does not move the indicator goes back to the portfolio to be adjusted or retired.
EvidenceAt Banco Pichincha the training of 12 professionals on their own products was part of the product and contributed to a 20% increase in productivity in preparing and using information.
The design decisions
How to bring AI to a company that is just starting: through its problems, not the tool
- When yes
- When a company is just starting with AI, the first inventory is of problems, processes and decisions; to bring AI to the company, each one is written with its user and expected result.
- When no
- When the initiative arrives pushed by a vendor or by enthusiasm for a tool: it does not enter the portfolio until it states which problem it solves.
Why
EvidenceAt Inglopres the ERP rollout (Odoo) showed that digitizing a process without reviewing it can carry its inconsistencies into the technology: the executed process was mapped and modeled in BPMN before configuring the solution.
State of the fieldThe Cloud Adoption Framework asks leaders to define the business outcomes AI is expected to support, and the AI strategy to document priorities, decision rights and how the value of the investment is measured.[1]
What criteria to use to prioritize AI use cases
- When yes
- To prioritize AI use cases, the criteria are potential value, feasibility, data availability, risk level, third-party dependency, integration complexity and capacity for adoption, applied to the whole portfolio.
- When no
- When a use case is chosen only for being the most innovative: the criteria look for learning and value without exceeding the organization's capacity to implement, oversee and sustain it.
Why
EvidenceAt Fundación CTIC use cases are prioritized with those seven criteria: of more than 10 opportunities half were formally evaluated and some were already prioritized, and that proportion is the filter working, not a lack of ideas.
State of the fieldMicrosoft recommends that an AI Center of Excellence create an intake and prioritization process with consistent criteria for business value, technical feasibility and resource requirements, and maintain a prioritized initiative backlog.[3]
Proof of value, pilot and scale: when to move forward and when to stop
- When yes
- When there is uncertainty about the data, the technology or adoption: the main hypothesis is tested at the lowest cost and the baseline is set before the pilot.
- When no
- When the need is met by a known, low-risk instrument: a proof of value only delays what is already clear.
Why
EvidenceAt Fundación CTIC stopping or redesigning a case after properly invalidating a hypothesis does not count as a failure: that most of the evaluated cases have not moved forward yet is the filter working.
State of the fieldThe Well-Architected Framework warns that, without strong leadership and a clear plan, AI efforts can quickly become fragmented and might not evolve beyond a proof of concept.[10]
Build, buy or compose: the solution with the least operational ownership
- When yes
- Buy or compose when an existing capability meets the need with less operation of one's own; build when the difference lies in one's own process and someone will run it.
- When no
- Building an agent for a problem that a process improvement, an analytics product or a conventional automation can solve.
Why
EvidenceAt Fundación CTIC the evaluation must first determine whether AI is needed and which kind of capability fits, so as not to build agents where a simpler instrument, such as an analytics product in Power BI, is enough.
State of the fieldThe Cloud Adoption Framework recommends approving the solution that meets the requirements with the least operational responsibility: greater customization generally requires more specialized skills and greater operational ownership.[1]
Center of excellence or federated model: centralize to start, delegate as it matures
- When yes
- A central center of excellence when the organization is just starting: it concentrates expertise and sets standards; as it matures, it advises and the areas build within those limits.
- When no
- A central team that approves everything when requests are already queuing and bottlenecks appear: governance is built into the platform and the center stops being a checkpoint.
Why
EvidenceAt Fundación CTIC the strategy seeks to establish a governance framework that splits the decisions: the business must answer for the purpose and the results, data owners for quality and conditions of use, and security, risk, compliance and technology must step in according to the initiative.
State of the fieldMicrosoft recommends starting with a centralized AI Center of Excellence and moving to an advisory role as adoption matures; for agents, most organizations blend centralized and federated structures by pattern, and the Fabric roadmap finds the unified or federated models most effective.[3][5][9]
How to measure the adoption of a new tool: users, use and decisions
- When yes
- To measure the adoption of a new tool: users responsible for the process, recurring use and decisions that rely on it, with training as part of the delivery.
- When no
- Counting access or assigned licenses as if they were adoption.
Why
EvidenceAdoption has been measured four times, with different users and decisions: more than 50 users at Banco Pichincha, more than 25 key users at TransMilenio, more than 15 roles with direct responsibility at Cafam and some 20 leaders of some 15 processes at Fundación CTIC.
State of the fieldIn the employee AI enablement pattern, Microsoft separates the early adoption signals —active users against assigned licenses, weekly use, retention— from the lagging signals of business value: adoption is the earliest signal and value is the proof.[6]
What is new in 2026
State of the field Value is decided at gates, not at the end
What changes from common practice
Before development, the indicators' baseline is set; at each stage the business metric decides whether to continue, change direction or stop, and after deployment the evidence decides whether to scale, improve or retire.[4][7]
JudgmentA proof of value without a baseline proves nothing: it only shows that something works.
State of the field The AI strategy as a charter with decision rights
What changes from common practice
The AI strategy documents the organization's priorities, decision rights and how the value of the investment is measured, and broad access to approved capabilities is paired with training.[1]
State of the field ISO/IEC 42001 as the backbone of the program, not only of compliance
What changes from common practice
The standard specifies how to establish, implement, maintain and continually improve an AI management system, and offers a structured way to manage risks and opportunities that balances innovation with governance.[11]
JudgmentA management system born with the first use case tends to cost less than one that arrives to audit what is already in operation.
State of the field The center of excellence moves from control to advice
What changes from common practice
The AI Center of Excellence starts centralized to concentrate expertise and, when delays and bottlenecks appear, moves to advising and setting guardrails while product teams deliver; for agents, the structure is chosen by adoption pattern and maturity, not by org chart.[3][5]
State of the field Governance built into the workflow
What changes from common practice
Centralized standards with distributed implementation: responsible AI checkpoints at design reviews, testing and prelaunch approvals, and formal sign-offs for high-risk AI.[12]
State of the field Twelve adoption areas, transferable to AI
What changes from common practice
The Fabric adoption roadmap organizes adoption into twelve areas —among them data culture, sponsorship, content ownership, center of excellence, governance, user enablement, community and change management— and distinguishes three content ownership strategies.[8][9]
JudgmentThe framework was born for analytics and its areas serve AI almost unchanged: sponsorship, ownership and enablement weigh more than the tool.
Failure modes and how to anticipate them
- What breaks
- Pilots that never get past the demo
- How it shows up
- Several proofs of concept open and none with an owner or a metric to scale.
- Control that catches it
- Every pilot is born with its baseline, its owner and the decision that closes it.
- What breaks
- The tool picks the use case
- How it shows up
- The initiative arrives with the product already chosen and no written problem.
- Control that catches it
- No opportunity enters the portfolio without a problem, a user and an expected result.
- What breaks
- An agent for a problem that needed a rule
- How it shows up
- Operating cost and risk out of proportion to the result.
- Control that catches it
- The evaluation first decides whether AI is needed and which capability fits.
- What breaks
- Isolated experiments by area
- How it shows up
- Similar solutions built twice, with different data and criteria.
- Control that catches it
- One shared portfolio with the same criteria and an inventory of AI systems.
- What breaks
- Governance arrives late
- How it shows up
- Risks, bias or information exposure discovered once in operation.
- Control that catches it
- Roles, risks and impact assessed from the design, inside the management system.
- What breaks
- Assigned licenses mistaken for adoption
- How it shows up
- Plenty of access and few decisions that change.
- Control that catches it
- Adoption measured in responsible users, recurring use and supported decisions.
- What breaks
- A center of excellence that becomes a bottleneck
- How it shows up
- Requests queuing and teams going around it.
- Control that catches it
- Moving to an advisory role with governance built into the platform.
- What breaks
- The capability depends on whoever built it
- How it shows up
- Nobody else can run or explain it when the team changes.
- Control that catches it
- Documentation, owners and knowledge transfer as part of the delivery.
Metrics and controls
- What is measured
- Opportunities with a written problem and owner
- Threshold
- All of those entering the portfolio.
- Who approves the step to production
- Whoever sponsors the portfolio.
- What is measured
- Initiatives with evaluation criteria set beforehand
- Threshold
- None starts without them.
- Who approves the step to production
- Whoever sponsors the portfolio.
- What is measured
- Proof-of-value hypothesis
- Threshold
- A written decision: move forward, adjust or stop.
- Who approves the step to production
- The owner of the initiative.
- What is measured
- The pilot's indicator against its baseline
- Threshold
- The result agreed before starting.
- Who approves the step to production
- The pilot's sponsor.
- What is measured
- Risks and impact assessed
- Threshold
- Before going into operation.
- Who approves the step to production
- Risk, compliance and the system owner.
- What is measured
- Active users against intended users
- Threshold
- A target set before launch.
- Who approves the step to production
- The process owner.
- What is measured
- Decisions or tasks supported by the capability
- Threshold
- Growing against the baseline.
- Who approves the step to production
- The process owner.
- What is measured
- AI systems in the inventory, with their life cycle
- Threshold
- All of those in operation.
- Who approves the step to production
- Whoever runs the management system.
The thresholds are examples of the method, not figures from a specific project.
Evidence from projects
- EvidenceLevel: Real use
Fundación CTIC: an AI portfolio with shared criteria
Since March 2025 Fundación CTIC's institutional AI strategy has been structured: more than 10 opportunities identified, half of them formally evaluated and some already prioritized; of these, the first ones already have owners, expected results, initial risks and evaluation criteria documented.
See where - EvidenceLevel: Under construction
Fundación CTIC: the management system under ISO/IEC 42001
The strategy follows the principles and requirements of ISO/IEC 42001, with more than 20 instruments of the management system and, under construction, a progressive inventory of AI systems and a governance framework that seeks to split roles between the business, the data owners and the risk, security and technology functions.
See where - EvidenceLevel: Real use
The app factory: two written approvals
In the AI-APPs pipeline no application moves forward without two written approvals —the current priority and the product vision— and critical decisions keep explicit human owners: of 12 initiatives conceived, only 7 have a repository.
See where - EvidenceLevel: Real use
The portfolio, a product of the factory
Ten sister applications, 11 agents, 7 research lines and 6 dashboards —34 pieces, not counting this site— come out of a pipeline with two houses, a factory agent, four CI jobs and a sheet contract.
See where - EvidenceLevel: Real use
Banco Pichincha: adoption and training as part of the product
In 2023, more than 50 business users adopted the team's solutions, with a reported 25% improvement in decision-making; training 12 professionals on their own products contributed to 20% higher productivity.
See where - EvidenceLevel: Real use
TransMilenio: adoption by key users
Between July 2021 and May 2022, at C&M Consultores, Power BI was adopted by more than 25 key users —people responsible for scheduling, monitoring and decisions, not just people with access— and helped improve the efficiency of the analytical processes by 35%.
See where - EvidenceLevel: Real use
Cafam: a new technology that enters through the process
Between October 2020 and June 2021, in the Oracle WMS Cloud implementation, a team of 20 people tested the system and the process at the same time; the control BI was adopted by more than 15 senior decision-makers in the project and improved the accuracy of test tracking by 50%.
See where - EvidenceLevel: Real use
Inglopres: the ERP as a precedent
At Inglopres (2015–2017), an ERP rollout (Odoo) took the operation from scattered records to a single place; before configuring it, the executed process was mapped and modeled in BPMN.
See where
Limits and scope
- Evidence
At Fundación CTIC the strategy and the management system are still in a progressive process of structuring and consolidation, and their figures are published as approximations.
- Evidence
At Fundación CTIC there is no team of direct reports: the work integrates whole processes, with some 20 leaders of some 15 processes, and the improvement plans are carried out by the process owners.
- Evidence
The app factory is the author's own work, built in public outside employment: it shows how what gets built is approved and governed, not an implementation in a client organization.
- Evidence
The center of excellence and the decision to build, buy or compose appear here as state of the field and criterion: the evidence from Fundación CTIC is the portfolio with shared criteria and the governance framework it seeks to establish.
- Evidence
The Inglopres ERP and the Cafam WMS are precedents of technology implementation, not of AI: what they teach is that a new technology enters through the process.
- Judgment
What should be done differently today: set the baseline and the metric that stops a pilot before the first proof of value, not afterwards.
- Judgment
An AI program is judged by the decisions it changes, not by the pilots it opens.
Sources and review date
- [1]AI adoption
Microsoft Learn ·
https://learn.microsoft.com/en-us/azure/cloud-adoption-framework/ai/strategy
- [2]Plan for AI adoption
Microsoft Learn ·
https://learn.microsoft.com/en-us/azure/cloud-adoption-framework/ai/plan
- [3]Establish an AI Center of Excellence
Microsoft Learn ·
https://learn.microsoft.com/en-us/azure/cloud-adoption-framework/ai/center-of-excellence
- [4]Business plan for AI agents
Microsoft Learn ·
https://learn.microsoft.com/en-us/azure/cloud-adoption-framework/ai-agents/business-strategy-plan
- [5]Choose your CoE structure and operating model
Microsoft Learn ·
https://learn.microsoft.com/en-us/agents/center-of-excellence/operating-models
- [6]Employee AI enablement pattern
Microsoft Learn ·
https://learn.microsoft.com/en-us/agents/adoption-patterns/pattern-employee-ai-enablement
- [7]Agentic AI maturity model - Business strategy
Microsoft Learn ·
https://learn.microsoft.com/en-us/agents/adoption-maturity-model/maturity-model-business-process
- [8]Microsoft Fabric adoption roadmap
Microsoft Learn ·
https://learn.microsoft.com/en-us/power-bi/guidance/fabric-adoption-roadmap
- [9]Microsoft Fabric adoption roadmap: Center of Excellence
Microsoft Learn ·
https://learn.microsoft.com/en-us/power-bi/guidance/fabric-adoption-roadmap-center-of-excellence
- [10]Build an AI Strategy for your SaaS Business
Microsoft Learn ·
https://learn.microsoft.com/en-us/azure/well-architected/saas/ai-strategy
- [11]ISO/IEC 42001:2023 Artificial Intelligence Management System Standards
Microsoft Learn ·
https://learn.microsoft.com/en-us/compliance/regulatory/offering-iso-42001
- [12]Responsible AI Policies
Microsoft Learn ·
https://learn.microsoft.com/en-us/azure/cloud-adoption-framework/ai/responsible-ai-policies